Monday, March 1, 2021

Rockville Metro pedestrian bridge repairs to begin today


WMATA is scheduled to finally begin repairs on the skybridge connecting Rockville Town Center to the Rockville Metro station today. The bridge has been closed since last summer, when glass panels on it suddenly shattered. Repair work on all the deficiencies of the bridge is scheduled to take seven months. 

Users of the convenient bridge have two options during the closure. A shuttle bus will run in between Monroe Street and the Metro station every 5-to-10 minutes during Metrorail operating hours. And a pedestrian detour route has been set up, running along Monroe Place. See the map above to plan the detour that works for you (click map to enlarge).

No comments:

Post a Comment